• 本文根据林分结构森林产量长期实验林研究成果提出刺槐抚育作业次序

    In the paper the sequence of forest tending operations in black locust stands is proposed, based on results of long-term stand structure and forest yield trials.

    youdao

  • 装卸计划中是否已经清楚地说明作业货舱,是否标明作业次序每次作业货舱转移货物等级吨数

    Have the holds to be worked been clearly identified in the loading or unloading plan, showing the sequence of work, and the grade and tonnage of cargo to be transferred each time the hold is worked?

    youdao

  • 作业序号决定执行次序

    The order number of the job determines the execution order.

    youdao

  • 通过使用AIX作业脱机程序,可以同时提交所有不连续的夜间作业因为假脱机程序会按照提交次序每次运行一个作业

    Using the AIX job spooler, all overnight non-sequential batch jobs can be kicked off at the same time because the spooler runs each job one at a time in the order they were submitted to the spooler.

    youdao

  • 工作量增加作业计划需时更久,要有次序时间表

    Your workload will increase and assignments and projects will take longer, plan your schedule accordingly.

    youdao

  • 更改作业排列次序先后

    Try re-order the activities sequence.

    youdao

  • 车间作业调度问题一类具有时间约束、次序约束资源约束的组合优化问题。

    The Job shop scheduling problem is a combinatorial optimum problem that is constrained with time, sequence and resource.

    youdao

  • 车间作业调度问题一类具有时间约束、次序约束资源约束的组合优化问题。

    The Job shop scheduling problem is a combinatorial optimum problem that is constrained with time, sequence and resource.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定