与管事部密切合作,提前计划并进行设备的交接和清洁工作。
Liaise and work closely with the Chief Steward for pre-planning and execution of delivery and cleanliness of equipment.
认真做好交接班工作,在《维修日志》上做好工作记录,确保同事之间掌握真实、准确的设备运行情况。
Maintenance Technician records the accurate equipment maintenance and repairing on the maintenance Log for each shift to make sure other colleagues to be informed well while shift changes.
C1变电站电气试验车适用于电力变电站及电气化铁路牵引变电所的电力设备的工程交接试验及预防性试验。
The Substation Electrical Testing Coach(EST-C1) is used for high voltage electrical equipment in substation or feeder station's preventive test and project's handing over test.
介绍了天然气流量计量交接站的设计要求、设计准则,以及建设计量站所需的设备。
Introduces the design requirements and principle of gas flow metering station as well as the necessary equipment.
及以下电压等级新安装的、按照国家相关出厂试验标准试验合格的电气设备交接试验。
Hand-over test of imported equipment shall comply with standard specified according to the contract.
及以下电压等级新安装的、按照国家相关出厂试验标准试验合格的电气设备交接试验。
Hand-over test of imported equipment shall comply with standard specified according to the contract.
应用推荐