该公司还提供建筑和工程服务,为水和污泥处理项目在中国。
The company also provides construction and engineering services for water and sludge treatment projects in China.
直接为客户服务的项目团队将实施“并行工程”的营销思路。
The team, who provide direct service to customers, implement a new marketing thought of "parallel project".
为所服务项目提供设计咨询,工程成本控制,工程及设备、材料招投标,工程项目管理等顾问服务。
They are designed to provide advisory services, project cost control, engineering and equipment, material bidding. project management consultancy services.
赛吉满为全球选煤行业提供世界领先的多专业工程、项目交付与运营服务。
Sedgman is a leading provider of multi-disciplinary processing engineering, project delivery and operations services to the global coal industry.
另一方面,工程咨询企业要获得更大的市场份额,为业主创造更多效益,就必须推进项目管理和工程总承包服务。
On the other hand, in order to obtain larger market share and to get more benefits for owners, the enterprises should provide project management and general contract service.
YPEC自成立以来,以诚信为本、服务客户为宗旨,以市场为导向,在所承担的所有工程项目中,经评定工程质量合格率100%。
Since the founding and through the hard working of all the staff, YPEC bases on credit, serves the clients, follows the guidance of market, by the assessment, the project qualified rate is 100%.
重大件货物作业是广州港集团的重要服务产品之一。近年来,集团为广州地铁、广州石化和广州乙烯等重大工程项目安全、优质、高效地接卸了一大重大件设备。
The Guangzhou Port Group provides the heavy and large piece handling service. It has successfully discharged heavy machines for Guangzhou Metro, SINOPEC Guangzhou and Guangzhou Ethylene.
公司从项目设计、制造和系统工程安装全过程集成化的为广大用户服务。
The company provides a series of services from project design, manufacture to its installation.
因此急需一套科学而又先进的成本管理方法为工程项目管理服务。
Therefore we urgently require advanced and scientific method of cost management to help cost management of construction project.
为世界上最大的水电站——三峡电站水利发电工程项目提供全部设备的跨国全程物流服务。
As the world's largest hydropower station - three gorges hydropower station water electricity generation projects 5 to provide full equipment multinational whole logistics services.
[摘要]指出在分包合同示范文本修订过程中,为保证修订范本与我国现行工程量清单计价模式相互协调,要重点解决三个方面的问题,即暂估价项目问题、总承包服务费问题和计日工作问题。
Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.
[摘要]指出在分包合同示范文本修订过程中,为保证修订范本与我国现行工程量清单计价模式相互协调,要重点解决三个方面的问题,即暂估价项目问题、总承包服务费问题和计日工作问题。
Abstract: the paper points out that there are three major problems to be solved during the process of revision of the subcontract, to ensure the revised subcontracts model consistent with BOQ methods.
应用推荐