• 同时,讨论了管理信息系统几个关键技术包括订单管理优化技术能力和能力需求计划负荷平衡技术

    In the meantime, the key technology is of the MIS are studied which include order management, production schedule, capacity requirement planning and resource loads balancing.

    youdao

  • 由于先进涡轮技术电厂CO2放量每年减少600,000,此减少每年的电量一样。

    Thanks to advanced turbine technology the plant's CO2 emissions will be reduced by 600,000 t per annum with the same amount of electricity being generated.

    youdao

  • 由于先进涡轮技术电厂CO2放量每年减少600,000,此减少每年的电量一样。

    Thanks to advanced turbine technology the plant's CO2 emissions will be reduced by 600,000 t per annum with the same amount of electricity being generated.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定