先房后柱的上向分层胶结充填法在我国应用较为广泛,但矿柱后期回采条件较差。
The practice cf mining room first and then pillars by overhand cut and cemented fill is widely used in China, but the condition for pillars recovery in later period is normally worse.
本文主要介绍了上向分段胶结充填采矿法在该矿的试验研究。
This paper introduced the test study of upward sublevel filling method in this mine.
推荐使用机械化上向水平分层充填采矿法,提出了安全回采措施。
The upward horizontal cut and fill stoping method and the measures for safe mining are recommended.
上向进路充填采矿法是一种具有广阔应用前景的采矿方法。
The upward drift stoping with backfill is a mining method with a widespread use future.
以某地下铜矿为研究对象,研究了地表要求保护的前提下极破碎矿体的顶板再造上向分段充填采矿法。
Take an underground copper mine as studying object, on which the surface has to be protected, the mining method of sublevel filling method with roof reconstructing is studied.
为此,试验用盘区上向分层干式充填采矿法进行回采,取得了较好的效果。
As viewed form this, the panel upward horizontal cut-and dry filling method has been tried to use for this orebody mining, with a better results.
针对其矿体不稳固、围岩中等稳固,以及存在较大采空区,矿体完整性遭破坏的情况,提出了上向进路充填法开采的设计方案。
Because of these problems such as unstable ore bodies, moderately-stable wall rock, large work-out area, the design proposal of mining these ore bodies by filling-up method is presented.
上向进路水砂充填采矿法是武山铜矿主要的采矿方法之一。
Upwards drift hydraulic fill mining is one of the main mining methods used in Wushan Copper Mine.
上向进路水砂充填采矿法是武山铜矿主要的采矿方法之一。
Upwards drift hydraulic fill mining is one of the main mining methods used in Wushan Copper Mine.
应用推荐