三峡右岸地下电站主厂房系统爆破开挖程序及开挖方法的研究成果,可供有关单位参考。
The results of the studies on the blasting excavation sequence and excavation options for the main carven system on the right bank of Three Gorges can be taken for reference by relevant units.
介绍了三峡右岸地下电站设计过程、总体布置及兴建时机的研究。
The design process and the general layout of the rightbank underground power station of TGP and its construction opportunity are described.
本文的分析与研究都基于三峡电源电站地下厂房工程,有明确的工程实践背景。
The analyses and research are based on underground power house of Three Gorges Hydropower Station which has the specific background of engineering.
三峡右岸地下电站主厂房系统爆破开挖程序及开挖方法的研究成果,可供有关单位参考。
The results of the studies on the blasting excavation sequence and excavation options for the main carven system on the right bank of Three Gorges can be taken for reference by relevant u...
三峡右岸地下电站主厂房系统爆破开挖程序及开挖方法的研究成果,可供有关单位参考。
The results of the studies on the blasting excavation sequence and excavation options for the main carven system on the right bank of Three Gorges can be taken for reference by relevant u...
应用推荐