-
The facility, which is called a "gas governor" and consists of a large slab of concrete, a flue pipe and a control box, is intended to regulate gas supply in the area.
BBC: The gas governor in Oxted
-
New techniques have been developed to "sidetrack" a well when the pipe gets stuck or to control the pressures and temperatures found five miles down into the earth's crust with blow-out preventers and special purpose high-tech drilling rigs.
FORBES: A Gold Mine In Oil Exploration
-
The friction caused by the gas bubble pushing up the pipe and displacing the drilling mud used to control the pressure could have created a static charge that ignited the gas into a fireball.
FORBES: BP's Deepwater Disaster: What Happened And Why?
-
At 8:20 p.m. on the day of the explosion the pressure data suggest there was a constant flow of sea water being pumped into the drill pipe that was displacing the heavier mud system which was the primary pressure control for the well.
WSJ: The Oil Disaster Is About Human, Not System, Failure
-
With full control of its plant in Abu Dhabi, Hilong has an additional drill pipe production capacity of 11, 023 tons, compared with its 44, 753 tons on the mainland.
FORBES: Add Oil! Chinese Drill-Pipe Maker Ventures Into The Middle East