The expense for the field acquisition of seismic data, i. e. the direct cost in the budget of the seismic engineering, accounts for about 80% of the whole engineering cost of seismic exploration.
在四川盆地的地震勘探工程中,地震资料野外采集施工费用,即地震工程预算中的直接工程费,占整个地震勘探工程成本的80%左右。
The expense for the field acquisition of seismic data, i. e. the direct cost in the budget of the seismic engineering, accounts for about 80% of the whole engineering cost of seismic exploration.
在四川盆地的地震勘探工程中,地震资料野外采集施工费用,即地震工程预算中的直接工程费,占整个地震勘探工程成本的80%左右。
应用推荐