本文对项目的工期计划也进行粗略的安排,并提出了项目建设和运营阶段的组织架构。
The thesis also draw a timetable of project implement and the organization structure diagram of both phases of project construction an operation.
将项目全寿命周期中影响现金流的建设阶段和运营阶段结合起来研究加气站项目进度问题,构建了项目进度问题的模糊相关机会规划模型。
With a combination of construction and operation stages in project life cycle, gas filling station project schedule was studied, and a fuzzy dependent-chance programming model was established.
厂房、进排水管网、污水处理设施建设和项目运营期间的经营管理。
Factory building, pipes network, facilities for the disposal of polluted water and management during the operation of the project.
厂房、进排水管网、污水处理设施建设和项目运营期间的经营管理。
Factory building, pipes network, facilities for the disposal of polluted water and management during the operation of the project.
应用推荐