• 建立项目变更控制委员会

    Change control board is established for the project.

    youdao

  • 然后源代码控制导入期望变更项目模块

    You then import from source control the projects or modules that you expect to change.

    youdao

  • 可以源代码控制系统中导入项目的情况下变更代码

    You can also change code without having to import the project from your source control system.

    youdao

  • 可以不同方式使用版本控制管理数据库变更项目

    You can use version control in different ways to manage your database change projects.

    youdao

  • 看起来许多接受过不是基于UP的敏捷性训练项目经理并不能够充分地认识对于增长变更控制严格性需要

    It seems that many PMs who have agile training that is not UP-based do not fully appreciate the need for increased change control rigor as the project progresses.

    youdao

  • 通过管理用户其它需求关联的可以更好地管理项目控制变更验证覆盖率

    By managing use cases in conjunction with other requirements your project can be better scope managed, change can be controlled and coverage can be verified.

    youdao

  • 1随着项目进展变更控制严格性也在不断地加强。

    Figure 1: Change control rigor increases as the project progresses.

    youdao

  • 此时项目经理需要绷紧变更控制或者无法要求交付风险

    At this point, the PM needs to tighten up the change control or risk failing to deliver on the team's commitments.

    youdao

  • 项目一开始就调节控制变更

    Accommodating and controlling change from the start of the project.

    youdao

  • 适应项目期间变更控制严格性

    Adapting change control rigor during the project.

    youdao

  • (记住因为项目来自源代码控制系统不能变更提交保存它们。)

    (But remember: Because this project didn't come from your source control system, you will not be able to check your changes in to save them.)

    youdao

  • 一方面,项目后期往往引入更多控制比如变更控制消除不想要创造性相关风险,以免在晚期引入缺陷

    On the other side, late in the project, you often want to introduce more control, such as change control boards, to remove undesired creativity and associated risk for late introduction of defects.

    youdao

  • 如果任何项目有关能够提交新的需求/变更需求项目很快地陷入一片混乱并失去控制

    Things can quickly get out of control if anyone associated with the project is able to submit new requirements and/or change requests.

    youdao

  • 请求要么记录变更控制系统中,要么对于正式项目来说,特别是极限程序设计项目中,记录卡片上活动挂图上。

    Requests are recorded either in change control systems, or even for more informal projects, particularly within eXtreme Programming projects, on CARDS or flip charts.

    youdao

  • 过程结果使项目管理计划通过整体变更控制过程得以更新修改

    This process results in a project management plan that is updated and revised through the Integrated Change Control process.

    youdao

  • 项目管理团队利用变更控制委员会具有专家判断利害关系者控制批准项目各个方面的所有变更请求。 。

    Thee project management team uses stakeholders with expert judgment on the change control board to control and approve all requested changes to any aspect of the project.

    youdao

  • 进度控制——控制项目进度变更

    Schedule control-controlling changes to the project schedule.

    youdao

  • 根据批准变更控制更新范围费用预算进度质量要求协调整个项目变更

    Controlling and updating the scope, cost, budget, schedule and quality requirements based upon approved changes, by coordinating changes across the entire project.

    youdao

  • 所有关于项目管理计划变更遵守变更管理流程置于变更控制之下

    All changes to the project management plan flow through the change management process and integrated change control.

    youdao

  • 项目采购管理包括合同管理变更控制过程,它们是管理授权项目团队成员签发合同采购订单所必需的。

    Project Procurement Management includes the contract management and change control processes required to administer contracts or purchase orders issued by authorized project team members.

    youdao

  • 继而提出加强公路建设项目工程变更管理控制策略

    And then strengthening the management of road construction projects engineering change control strategy is proposed.

    youdao

  • 变更控制系统正式形成文件过程的全体,用于确定控制改变批准项目交付成果和文件方式、方法。

    The change control system is a collection of formal documented procedures that define how project deliverables and documentation are controlled, changed, and approved.

    youdao

  • 由于项目很少准确地按照项目管理计划进行,因而变更控制必不可少

    Change control is necessary because projects seldom run exactly according to the project management plan.

    youdao

  • 控制项目范围变更需要过程

    This is the process necessary for controlling changes to the project scope.

    youdao

  • 控制项目进度变更需要过程

    This is the process necessary for controlling changes to the project schedule.

    youdao

  • 变更控制流程为了帮助管理干系人的关键期望保证项目基准的严肃性。

    The change control process is meant to protect sacred project baselines while helping to manage key expectations among project stakeholders.

    youdao

  • 费用控制-控制项目预算变更

    Cost control-controlling changes to the project budget.

    youdao

  • 但是变更控制并不需要严格项目基准神圣不可侵犯的程度,弹性必要的。

    But while change control does need to be a strict process that treats the project baseline as holy, it does not need to be inflexible.

    youdao

  • 并且需求变更时,工具可以项目负责人提供变更影响分析,便于负责人控制整个开发过程

    Also, when some requirements must be changed, this tool can provide impact analysis for the project leader. And then the leader can control the whole developing process.

    youdao

  • 建设项目工程变更控制过程工程变更方案技术经济评价建设项目工程变更控制管理重要环节

    The technology economic evaluation of construction change plan is the important link of construction project change management in the process of construction project change control.

    youdao

$firstVoiceSent
- 来自原声例句