交通工程分期实施可分为纵向分期、横向分期和按工程项目分期三类。
The time implementation of traffic engineering can be classified into three kinds: longitudinal stage, transverse stage and stage by project items.
再好一点就是,你能一直部署代码到分期系统,从而让客户够看到未完成的项目和它一天天的改变。
Bonus points if you can continuously deploy your code to a staging system where clients can view the unfinished project and see how it is changing day after day.
雇佣新人的最佳时机就是你刚争取到某个预付项目款或分期付款的大项目的时候。
The best time to hire someone new is right after you bag yourself a big project that pays in advance or in installments.
好的,在你开始编写你的项目之前,你应该有一个能部署你的项目代码为产品的系统(最好对于分期和开发环境也是如此)。
Well, before you start coding your project, you should have a system set up that lets you deploy your project code into production (and preferably staging and development environments as well).
在一些特殊项目的进口中,我们采用“分期付款”方式。
We adopt "payment by installments" for some special import items.
分期建设:现有厂区及车间将保证百家汇项目中试放大需求。
Staged construction: current plants to meet the needs for pilot manufacturing of the enterprises.
化工项目建设,尤其是大型项目的建设,一般需要较长的时间,有时还要分期建设。
It takes a long time to build a large chemical engineering project and sometimes it has to be done by stages.
再好一点就是,你能一直部署代码到分期系统,从而让客户够看到未完成的项目和它一天天的改变。
This way, as you write your code, you'll have the peace of mind that comes with knowing your project can be deployed at any moment.
在佛山,禅城绿地中心项目包括两个分期建设阶段,430,000平方米的开发项目位于旧城区东部沿连接佛山与广州的主要干道。
In Foshan, the Chancheng Greenland Center involves a two-phased, 430,000-square-meter development located east of the Old City District on a major arterial roadway linking Foshan with Guangzhou.
瓜达尔深水港项目采取分期建设。
瓜达尔深水港项目采取分期建设。
应用推荐