• 黄土高原项目有利影响不仅仅限于项目

    The benefits of the Second Loess project are not limited to the project area.

    youdao

  • 国际专家帮助设计开发项目二期活动逻辑框架项目指标节能计算方法

    Develop the logical framework and project indicators and energy saving methodology etc under the help of international expert;

    youdao

  • 到2006年项目末期,该规划超额完成了最初目标

    By the end of the second phase in 2006, project outputs surpassed initial targets, as follows.

    youdao

  • 欧盟同意继续帮助中国能力建设方面努力同时双方2004年世界贸易组织对华援助项目启动表示欢迎

    The EU agreed to continue to assist China's efforts in capacity building and both sides welcomed the launching of the second WTO support programme for China in 2004.

    youdao

  • 项目注重建立地区卫生服务提供能力应对导致死亡残疾首要原因——心血管疾病伤害

    The second phase will focus on building service delivery capacity to address cardiovascular disease and injuries, the leading causes of death and disability in the region.

    youdao

  • 项目实施期间,年人均粮食产量365公斤增加591个公斤。

    During the second project period, per capita grain output increased from 365 kg to 591 kg per year.

    youdao

  • 进程中世行国家它们目标如何评价进展情况达成谅解如果认为进展已经充分,则项目提供资助

    Under this process, the Bank and the country reach an understanding about their goals and how to assess progress and if it is deemed adequate, funding can be provided for a second operation.

    youdao

  • 介绍中海石油化学有限公司化肥项目工程建设生产准备一体化各项管理工作实施成效

    Presents integrated management of engineering construction and production preparation of the second stage chemical fertilizer project of Fudao chemical co., as well as the execution efficacy.

    youdao

  • 介绍了泰州市环城河风景区仿古商业步行街项目规划建筑设计

    The planning and architectural design of the Antique Commercial Walk Street in the second phase of the Round-the-City River Scenic Area, Taizhou, is introduced in this paper.

    youdao

  • 驿动传媒旗下出租车椅背广告项目投放1000九江市1487台出租车全部投放。

    Moving the media's taxi back advertising program a run of 1000 units, two sets of Jiujiang City taxi 1487 All running.

    youdao

  • 项目哈尔滨群力新区带状公园景观设计——金河公园。

    The project is the second stage of the belt-shaped scenery park in the Qunli New District in Harbin.

    youdao

  • 项目规划包含购物中心包含酒店以及别墅

    The scheme includes duty free shop center, hotels and private villas. The whole project will be constructed in two phases.

    youdao

  • 通过项目实施增强号召力项目质量实施奠定了基础

    Through the implementation of the project to enhance the appeal of the provincial AIDS Prevention Office, for two high-quality implementation of the project laid the foundation.

    youdao

  • 最终取得安徽省vod建设项目南京VOD建设项目业绩

    And ultimately get construction projects in Anhui Province and Nanjing Network VOD VOD Phase II construction project performance.

    youdao

  • 项目选址于鹤城区鸭嘴岩李公湾境内,连接鹤城区鸭嘴岩工业园二期工程的重要通道

    The bridge is situated at Ligongwan Yazuiyan Town Hecheng District, which is a key passageway to Yazuiyan Industrial Park.

    youdao

  • 秦山扩建项目和秦山核电厂扩建项目方家山核电工程也已动工建设

    The second phase extension projects of Qin Shan as well as Qin Shan nuclear power plant which is called Fang Jia Shan nuclear power project, have begun to construct.

    youdao

  • 雨林将要开始他们总面积达400(26.8公顷)项目,可以解决这里6000就业

    Rain Forest was going to start their Project phrase II with total area of 400 mu (26.8 hectares), including conference room for 6,000 people Max.

    youdao

  • 项目第一已经完成完善中。

    The first installment has been completed, the second one is in progress.

    youdao

  • 本论文研究内容来自于某航空机轮刹车试验台二期技术改造项目

    The purpose of this thesis is to improve the GEC electrical cabinet of the Aircraft Tyre Wheel and Brake Test Dynamometer.

    youdao

  • 本论文研究内容来自于某航空机轮刹车试验台二期技术改造项目

    The purpose of this thesis is to improve the GEC electrical cabinet of the Aircraft Tyre Wheel and Brake Test Dynamometer.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定