同时,投入双倍的队伍和设备,24小时连续施工,采取两头钻进的办法加快施工进度。
Meanwhile, put a double team and equipment, 24 hours of continuous construction, drilling two ways to speed up the construction progress.
施工期间,24小时连续施工,保证了客户旧锅换新锅的顺利准时完工,得到了客户的好评。
For site installation, take 24 hours continuous construction which assures customer's old pot removal and new pot installation finish on time and get customer's praise.
本合同段控制性关键工程是预应力砼连续组合箱梁的施工。
The controlled crucial works for this contract section is the construction for the prestressed concrete continuous combined box beam.
特殊施工阶段实施24小时连续作业,工人工作实行三班制。
In special construction stage, 24 hours continuous work will be executed and three-shift work system to be carried out.
本文就地下连续墙施工中这两个应注意的问题进行了讨论。
This article discusses the two noticeable problems in the construction of under ground continuous wall.
介绍了特大型连续梁桥悬拼施工测量控制的理论、方法和精度设计。
The theory, method and precision design for surveying control in suspending construction of continuous beam bridges are introduced.
本文就地下连续墙施工中这两个应注意的问题进行了讨论。
This article discusses two noticeable problems in the construction of underground continuous wall.
液压双轮铣作为一种新型的机械设备,在地下连续墙工程施工中得到了日益广泛的应用。
As a new machine, hydraulic double wheel trench cutter is widely used in the construction of the underground continuous wall.
本文分析了地铁连续墙施工中的关键部位“异形幅”的主要质量问题及成因,提出了有效的质量控制措施。
This paper analyzes the construction of the subway wall, a key component of a continuous "shaped pieces of" major quality problems, put forward effective quality control measures.
对东海大桥辅通航孔连续梁桥的施工控制作了简要介绍。
Construction control of auxiliary channel continuous girder Bridges of Donghai bridge is briefly introduced.
从而将灰色系统理论成功应用到大跨度预应力砼连续梁桥的施工控制中。
Then the gray system theory is applied in the construction control of long-span prestressed concrete continuous beam bridge.
连续梁施工过程中,线形控制至关重要。
During construction of continuous box girder, line shape control is important.
灰色预测控制系统不仅可以对大跨径连续梁桥的施工进行控制,而且方法简单,效果显著。
Gray predict control system can be applied in construction control of long-span prestressed concrete continuous bridge, and the method is simple, the result is prominent.
临时支座的拆除是先简支后连续结构体系施工过程中的关键工序之一。
The removal of temporary bearings is one of the key procedures in the construction of transforming a simply-supported bridge structure into a continuous one.
进而提出在地下防渗墙(连续墙)施工中应注意的几个问题。
Some questions should be highly heeded during construction of the Cut off Wall.
结合内蒙古黑沟特大桥工程实例,探讨了预应力混凝土连续刚构桥的施工应力控制方法。
In combination with the Heigou Bridge Project in inner Mongolia, the methods of construction stress control are discussed in this paper.
介绍汉川汉江公路大桥非连续段箱梁的悬臂现浇施工技术,可供有关工程技术人员参考。
This paper introduces the cast in place cantilever construction technology used in uncontinous box beam of the Hanchuan Hanjiang River Bridge.
挂篮是目前大跨径预应力混凝土连续刚构桥和连续梁桥在悬臂浇注施工时主要采用的施工设备。
The hanging baskets are the main equipments in the cantilever casting construction of large-scale prestressed concrete continuous rigid bridge and continuous girder bridge.
解决了冬施中既要满足混凝土结构的强度要求,又要加快施工进度,保证连续作业的问题。
The technology can not only meet strength demand of concrete structure but also solve the problems of accelerating construction speed and guaranteeing constant work.
该连续刚构桥构造复杂,且受施工环境因素制约,增加了该桥施工难度。
This continuous rigid-frame bridge construction of complex structure, and environmental factors, increases the difficulty of construction.
结合钢箱梁顶推实例,介绍了变高度曲线连续钢梁顶推施工技术,总结了该施工方法的经验,对类似桥梁的施工有参考价值。
In combination with steel box girder construction by incremental launching method, the paper introduced the construction technique of variable depth curved steel continuous box girder.
根据此特点,选择人工成孔地下连续墙逆作法施工。
Artificial borehole diaphragm wall and reverse construction method are adopted according to the characteristics.
为保证在施工期间的交通正常运行,连续梁的施工特采取贝雷杆件组拼支墩和横梁作为支撑系统。
In order to ensure the normal operation of traffic in construction the continuous box beam 's construction adopts cross beam as supporting system and Bailey member bars as abutments.
为了保证大跨径连续刚构桥悬臂施工的质量和安全,施工控制是非常重要的。
To ensure the quality and security of the prestressed concrete continuous rigid frame bridge, construction control was of great importance.
介绍移动模架施工现浇混凝土连续箱梁的施工工艺,以及在施工中应该注意的事项。
This article gives the construction procedure and instructions for on-site casting of continuous concrete box beam with mobile mould.
根据福州新世纪大厦地下连续墙设计与施工的体会,就超深地下室地下连续墙设计中的若干问题进行评述。
According to the design and construction of Fuzhou New Century Building, several matters about the design of diaphragm wall for extremely deep basement are commented.
介绍了预应力混凝土连续刚构桥的施工控制原理和方法,以及磴口黄河大桥施工控制的实施步骤。
The principles and methods of construction control of pre_stress concrete continuous rigid frame bridge, and detailed construction control measures of Denkou Yellow River are introduced in the paper.
介绍了预应力混凝土连续刚构桥的施工控制原理和方法,以及磴口黄河大桥施工控制的实施步骤。
The principles and methods of construction control of pre_stress concrete continuous rigid frame bridge, and detailed construction control measures of Denkou Yellow River are introduced in the paper.
应用推荐