出厂前压力变送器已按订货要求调试合格,用户无需再做调整。
Before delivery pressure transmitters has been calibrated as per ordering requirement, user doesn't need adjustment.
负责设备的安装调试到生产出合格产品后,我公司技术安装人员方撤离;
Second, responsible for the equipment installation, debugging to produce qualified products, our company technical installation personnel evacuation party;
在生产调试中出现的生料率值合格率偏低、窑尾结皮、电除尘器排灰问题均得到了较好的解决。
During commissioning, problems like low qualified raw meal modulus, accretion within preheating system and ESP dust discharge failure are all solved.
本厂郑重承诺:凡客户在本处购机负责调试安装上马至客户正常生产合格产品!
This factory pledged seriously: Every customer buys in this place machine is responsible to debug the installment to start to the customer regular production certified product!
维修后的测试,可以排除人为因素引起的安装不到位、参数调试不合格、管路不到位等,避免在治疗过程中引起故障出现医疗事故。
The test after maintenance can remove such personal factors as bad installation, disqualification of parameter debugging, fault in pipeline, etc. It avoids some malpractice during the treatment.
公司负责设计,安装,调试,生产及代培生产人员,交给用户一台合格的造纸生产线。
Our company designs, assembles, tests, produces and trains the technical workers, doing our best to give the customer the best making and producing line.
从物料试验到设备选型,从设备的安装调试到生产出合格的产品,我们将为客户提供全程周到细致的服务。
From the material experiment to choosing equipments, adjusting to try to produce a qualified product from the gearing of the equipments; we will provide our perfect service for our customer.
在进行具体调试、检测、验收合格后才将投入使用。
Carrying out specific debugging, testing, inspection and acceptance will be put into use before.
检查设备是否合格的检测程序符合国际电工委员会标准第545条”调试运行与维护液压轮机指南”。
The procedures for testing of the equipment to check its conformity with the specifications will be in accordance with IEC. Pub.
检查设备是否合格的检测程序符合国际电工委员会标准第545条”调试运行与维护液压轮机指南”。
The procedures for testing of the equipment to check its conformity with the specifications will be in accordance with IEC. Pub.