以金沙江中游梯级水电站群为例,通过计算,得到了合理的联合优化调度方案。
Taking the cascade hydropower stations of the middle Jinsha River as an example, a reasonable optimal dispatching solution is obtained through calculation.
建立了梯级水电站中长期联合优化调度模型,并采用逐步优化算法对其进行求解。
A model of mid-long term optimal dispatching of cascade hydropower stations is established and a solution is given using progressive optimality algorithm.
计算结果表明,采用混合优化算法的水库群联合优化调度可以在一定程度上提高水资源利用效益,具有很强的实用性。
Calculation results show that the use of hybrid optimization algorithm in multi-reservoir optimal operation can to a certain extent, to improve water use efficiency, with strong usability.
该系统集成了洪水预报、水库调度、发电优化、数据整编等各方面功能,并可进行梯级电站联合调度。
The system combines flood forecasting, power generation optimization, data reorganization and many functions so on and can make joint dispatching of cascade hydropower stations.
并应用该模型对三峡电力系统水电站群与三峡电站联合运行进行了优化补偿调度研究。
Using this model the optimum compensating dispatching in the cooperation of Three Gorges hydropower station with the hydropower station group within the Three Gorges power system is studied.
本文分析了两库对径流的最大调节程度,进而推选出可行的联合调度方案,并对调度方案进行优化。
The paper analyses the maximum regulation level of two reservoirs to the runoff, defines the feasible joint operation scheme, optimizes the operation scheme.
实验结果表明该联合算法得到的优化结果劣于整数线性规划算法,但是优于表调度算法。
The result shows that the combining algorithm can arrive at worse code than ILP but better than list scheduling.
三峡工程; 联合通航调度;滚动时域调度;混合整数规划;混合优化算法;
The Three Gorges Project; navigation co-scheduling; rolling horizon procedure; mixed-integer programming; hybrid optimization algorithm;
三峡工程; 联合通航调度;滚动时域调度;混合整数规划;混合优化算法;
The Three Gorges Project; navigation co-scheduling; rolling horizon procedure; mixed-integer programming; hybrid optimization algorithm;
应用推荐