介绍了某黏土心墙砂砾石坝的安全监测成果。
Safety monitoring results of a dam with clay core are presented.
尼尔基水利枢纽工程主坝结构形式为沥青混凝土心墙砂砾石坝。
The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.
胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。
Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).
介绍了合溪水库工程的概况,选用坝型为粘土心墙砂砾石坝,根据粘土和砂砾石料场的颗分曲线,对反滤料进行了设计。
Hexi Reservoir Project, applying filter design, is introduced, which is made up of clay central core and sandy gravel dam according to the gradation curve of clay and gravel.
本文简易介绍了劈裂灌浆的施工工艺,通过资料分析、灌后检查,证明在含砾石土石坝加固处理中取得了较好的效果。
The construction craft of the split grouting is introduced in this paper, By check analysis, the split grouting has proved itself to get a good result in reinforcement of the gravel earth dam.
采用室内中型三轴试验和现场碾压载荷试验对糯扎渡高心墙堆石坝心墙砾石土料的变形特性进行了研究。
The deformation properties of core gravelly soil of the Nuozhadu high rockfill dam are studied by using medium-scale triaxial tests and the field loading tests.
查龙电站面板堆石坝坝体及沙砾石副坝填筑体按不同填筑区填筑沙砾石料。
Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.
河床天然砂卵砾石层能否作为超高面板坝坝基是该工程的关键技术问题之一。
Whether the natural sand gravel stratum in the river bed would serve as the foundation of the superhigh faced rockfill dam or not was one of the key technical problems of the project.
拦河主坝坝壳以当地材料砂砾石为主,防渗心墙比较了粘土心墙、沥青混凝土心墙和斜墙型式。
The material of the main dam shuck is mainly the local sandy gravel. The clay core and the asphalt concrete core were compared in the choosing of seepage prevention type.
1985年对该坝采用砂砾石料覆盖和沥青混凝土面板加固等综合措施进行了处理。
During the rehabilitation construction of 1985, the asphalt facing was covered by the sand gravel with a stone pitching surface.
大坝主体由堆石坝或砾石组成,起支撑作用,中间设置沥青混凝土心墙起防渗作用。
The principle part of the dam which plays a supporting role is made of moraines and gravel and its middle position setting asphalt concrete core-wall plays an anti-seepage role.
大坝主体由堆石坝或砾石组成,起支撑作用,中间设置沥青混凝土心墙起防渗作用。
The principle part of the dam which plays a supporting role is made of moraines and gravel and its middle position setting asphalt concrete core-wall plays an anti-seepage role.