• 介绍了黏土墙砂砾石坝安全监测成果

    Safety monitoring results of a dam with clay core are presented.

    youdao

  • 尼尔基水利枢纽工程主结构形式为沥青混凝土石坝

    The dam structure of main dam of Nierji Water Complex is gravel dam with asphalt concrete core wall.

    youdao

  • 石坝(CSG)介于混凝土面板堆石(CFRD)碾压混凝土重力(RCC)之间一种

    Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).

    youdao

  • 介绍了合溪水库工程概况,选用粘土石坝根据粘土砾石料场的颗分曲线,对反滤进行设计

    Hexi Reservoir Project, applying filter design, is introduced, which is made up of clay central core and sandy gravel dam according to the gradation curve of clay and gravel.

    youdao

  • 本文简易介绍了劈裂灌浆施工工艺通过资料分析、灌后检查证明砾石加固处理取得好的效果

    The construction craft of the split grouting is introduced in this paper, By check analysis, the split grouting has proved itself to get a good result in reinforcement of the gravel earth dam.

    youdao

  • 采用室内中型三轴试验现场碾压载荷试验扎渡堆石心墙砾石土料变形特性进行了研究。

    The deformation properties of core gravelly soil of the Nuozhadu high rockfill dam are studied by using medium-scale triaxial tests and the field loading tests.

    youdao

  • 查龙电站面板堆石砾石填筑不同填筑填筑沙砾石料。

    Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.

    youdao

  • 河床天然砾石能否作为超高面板工程关键技术问题之一

    Whether the natural sand gravel stratum in the river bed would serve as the foundation of the superhigh faced rockfill dam or not was one of the key technical problems of the project.

    youdao

  • 拦河当地材料为主防渗比较粘土墙、沥青混凝土心墙和斜墙型式

    The material of the main dam shuck is mainly the local sandy gravel. The clay core and the asphalt concrete core were compared in the choosing of seepage prevention type.

    youdao

  • 1985年对采用覆盖沥青混凝土面板加固等综合措施进行了处理。

    During the rehabilitation construction of 1985, the asphalt facing was covered by the sand gravel with a stone pitching surface.

    youdao

  • 主体由堆石砾石组成支撑作用中间设置沥青混凝土心墙防渗作用。

    The principle part of the dam which plays a supporting role is made of moraines and gravel and its middle position setting asphalt concrete core-wall plays an anti-seepage role.

    youdao

  • 主体由堆石砾石组成支撑作用中间设置沥青混凝土心墙防渗作用。

    The principle part of the dam which plays a supporting role is made of moraines and gravel and its middle position setting asphalt concrete core-wall plays an anti-seepage role.

    youdao