• 论文大量研究工作基础,实现设计的计算机自动化。

    This study resolves automation of medium length blasting design based on the substantive research work.

    youdao

  • 设计原因基础集合无法存储为零

    Are there deep design reasons for Foundation collections' inability to store nil?

    youdao

  • 本文首先分析传统设计问题然后针对微米系统,对失配产生的问题进行比较分析,基础提出改进方法新型结构

    This thesis first analyzes basic design of sense amplifier in deep sub-micron system, compares and discusses the mismatch problem, and then the new design is presented.

    youdao

  • 丁坝极限值确定建筑物基础埋设一个主要因素丁坝设计施工中的关键问题在于确定坝头最大冲

    The scour limit depth around spur dikes is very important for calculating the base depth of objects and it is a key factor in designing and working.

    youdao

  • 有限元模拟基础上,采用正交设计最小二乘小波支持向量对充过程参数优化进行了研究。

    Orthogonal design and least squares wavelet support vector machine are integrated to optimize the technological parameters of hydro-mechanical deep drawing process using FEM.

    youdao

  • 以上研究基础,在CATIA 平台上开发了设计流程知识驱动的拉快速设计系统

    Based on the above mentioned research, a drawing die system driven by designflow and knowledge is implemented on CATIA platform.

    youdao

  • 介绍了上部结构设计措施,基础抗浮底板外墙的处理方法。

    The design of cantilever beam, joist and battered column in the upper structure was introduced. The anti-float of deep foundation problem and baseplate and concrete external wall were introduced.

    youdao

  • 基于GIS油气管线设计系统是以GIS数据基础确定管道设计中线的位置,包括平面位置纵向提取管线数据自动进行工程土方量、占地面积、工程拆迁等方面的工程概预算

    Pipeline design system based on GIS is based on data of GIS to locate the center line of pipeline in plane and portrait, and extract pipeline data to make automatically project budget estimate.

    youdao

  • 基础结构工程设计中,将地下连续地下室底板部分楼板、作为基坑开挖时支护体与临时支撑

    So-called composite (three functions) deep foundation structure is defined as: to use slurry wall, basement base plate and a part of plate beam as foundation pit bracing;

    youdao

  • 基础结构工程设计中,将地下连续地下室底板部分楼板、作为基坑开挖时支护体与临时支撑

    So-called composite (three functions) deep foundation structure is defined as: to use slurry wall, basement base plate and a part of plate beam as foundation pit bracing;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定