并提出了适应优化方案的劳动力组织和机械配置方案。
And the scheme which could meet the workforce optimization and mechanical configuration was proposed.
介绍圆梁山隧道出口端各个施工阶段的施工方案及相应的机械设备配置。
The paper presents the construction methods and corresponding machinery matching schemes adopted in each construction stage of exit portion of Yuanliangshan tunnel.
ICS公司为涡轮机械的自动化升级改造提供整套解决方案,包括规划、工程、配置、安装和调试。
ICS provides turnkey solutions - including planning, engineering, configuration, installation, and commissioning - for turbomachinery automation retrofits.
ICS公司为涡轮机械的自动化升级改造提供整套解决方案,包括规划、工程、配置、安装和调试。
ICS provides turnkey solutions - including planning, engineering, configuration, installation, and commissioning - for turbomachinery automation retrofits.