该状态报告由核质量保证工程师(NQA)负责评审,所有登记在册规范文件的状态应通知管架集团(psg)的工程总监。
This status report is reviewed by NQA Engineer and the PSG Engineering Director is advised regarding the status of all registered code documents.
该状态报告由核质量保证工程师(NQA)负责评审,所有登记在册规范文件的状态应通知管架集团(psg)的工程总监。
This status report is reviewed by NQA Engineer and the PSG Engineering Director is advised regarding the status of all registered code documents.
应用推荐