然后将该外币现值按照计算资产未来现金流量现值当日的即期汇率进行折算。?。
Then the current value of the foreign currency shall be converted at the spot exchange rate of the current day when the future cash flow of the asset is calculated.
对现值的折算,用传统折算法步骤较烦,用改进折算法则较简。
On the discount of present worth, the improved method is more simple than the traditional method.
现值(PV) –未来EVA(正值或负值)以资本成本进行折算后的现在的价值。
Present Value (PV) - The value today of future EVA (positive or negative) obtained by discounting EVA at the Cost of Capital.
现值(PV) –未来EVA(正值或负值)以资本成本进行折算后的现在的价值。
Present Value (PV) - The value today of future EVA (positive or negative) obtained by discounting EVA at the Cost of Capital.
应用推荐