• 咸水湖正在达成能力而且任何潜在溢值的时候,葡萄酒酿造厂会环保署合作测试任一灌入城镇废物水系

    The winery would work with the EPA to test the water when the lagoons were reaching capacity and any potential overflow would either to be pumped into to the town waste water system.

    youdao

  • 咸水湖正在达成能力而且任何潜在溢值的时候,葡萄酒酿造厂会环保署合作测试任一灌入城镇废物水系

    The winery would work with the EPA to test the water when the lagoons were reaching capacity and any potential overflow would either to be pumped into to the town waste water system.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定