在流程的将来版本中,我使用Exponential分布将该任务的持续时间模拟为平均30分钟,如图39所示。
In the To-Be version of the process, I modeled the duration for the task using an Exponential distribution with a mean of 30 minutes, as Figure 39 shows.
在流程的将来版本中,我使用Exponential分布将该任务的持续时间模拟为平均30分钟,如图39所示。
In the To-Be version of the process, I modeled the duration for the task using an Exponential distribution with a mean of 30 minutes, as Figure 39 shows.
应用推荐