• 隧道衬砌埋段结构荷载计算表明复合式衬砌中的初期支护二次衬砌一般要共同承担荷载。

    The calculation of structural load on the lining of tunnel with shallow overburden shows that the load on composite lining will be shared by primary support and secondary lining.

    youdao

  • 原理进行设计结构采用等截面复合式衬砌,施工采用侧壁台阶组合法暗挖施工,工程设计难度大、施工风险高。

    It is a super-shallow-berried single-span tunnel project. The New Austrian Tunneling Method is used in design of station, constant-section composite lining is employed for the station structure;

    youdao

  • 原理进行设计结构采用等截面复合式衬砌,施工采用侧壁台阶组合法暗挖施工,工程设计难度大、施工风险高。

    It is a super-shallow-berried single-span tunnel project. The New Austrian Tunneling Method is used in design of station, constant-section composite lining is employed for the station structure;

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定